How Winter Weather Can Affect Commercial Construction

How Cooler Weather Affects Commercial Construction

The old joke about Canada is that there are two seasons:  winter and construction.  But the fact is that construction doesn’t have to be limited to the warmer months.  While it’s possible to achieve most types of commercial construction goals all year round, winter construction poses some challenges that require a bit more time and forethought.  To help you with your cold-weather projects, we’ve put together this list of how winter weather can affect commercial construction.

Concrete Pouring

Newly poured concrete that’s exposed to freezing temperatures can end up half as strong as concrete poured in warmer weather.  You’ll want freshly poured concrete to be given at least 24 hours of moderate temperatures to allow it to set properly.  During winter commercial construction like this may require the use of shelter, artificial heating and/or concrete blankets.

Painting

Paint is another construction material that can be negatively affected by freezing weather.  Not only does the cold cause paint to dry more slowly, but it can also make it difficult to achieve a proper finish.  Cold weather can also make the paint more sensitive to mold problems.  If you absolutely have to paint in freezing weather, bringing in some external heating sources is a must.

Bricklaying

Cold weather can play games with brick mortar by preventing moisture from fully incorporating into the mixture.  This can lead to weakened mortar strength and serious problems down the line.  One old bricklayer trick is to preheat the bricks before laying them.  You can also employ brick coverings and external heating to increase the temperature.

Ground Settlement

Ground that’s broken and graded when frozen could settle once warmer weather arrives.  The ice particles in the soil will prevent it from being properly compressed.  If these steps need to be taken in freezing weather, attention will need to be paid to ensuring the ground is properly compacted before building on top of it.  Big problems can result without proper attention.

Drywalling

Like many materials, drywall has a tendency to slightly shrink in cold temperatures. This can lead to problems with expansion once the temperature rises, so gaps need to be left when hanging drywall in the cold.  Ideally, you would hang drywall in temperatures over 10 degrees Celsius.  If working in colder temperatures, ⅛” gaps need to be left between the drywall sheets.  

Get in Touch

George Nela
George Nela
Read More
MMD Construction built us retail space on the second story of our current store space. Dino and his team built walls, cut out spaces for internal windows, ran wiring, installed lights, and put down floors. The job was done timely with minimal disruption to business and we now have a functioning business up on the second level. Thank you!
Ben Adelman
Ben Adelman
Read More
MMD is one of the best companies I have had the pleasure to work with. Highly professional from start to finish, available any time to meet or speak with you. MMD has a great team that meets deadlines and delivers. One of the things that I liked about working with them was that they were very experienced and anticipated any possible complications. They were fully transparent from the beginning of the process, so there were no surprises later.
Alina T.
Alina T.
Read More
We’ve done 2 projects with MMD Construction. The high standards of the company are reflected by their employees and the trades they work with. MMD's team delivered our design & build project on time and on budget. If we have a third project in our future, you can be assured that we’ll work with MMD Construction again!
David Lee
David Lee
Read More
We recently used Dino and his team to do a commercial build for our interior space. They were very professional and knowledgeable. MMD was able to deliver our job ahead of schedule and on budget. Great people to work with. We would hire them again in the future and would recommend them for your next job.
Previous
Next